ID |
Max (MW) |
Mean (MW) |
Min (MW) |
Sum (MWh) |
Mean/Max (%) |
SCADAVALUE:DISPATCH (CALLIDE: 770 MW of Black coal in QLD1) |
577.9 |
535.6 |
349.1 |
398,454.8 |
92.7 |
SCADAVALUE:DISPATCH (CALLIDEC: 1000 MW of Black coal in QLD1) |
435.6 |
252.1 |
0.0 |
187,506.4 |
57.9 |
SCADAVALUE:DISPATCH (G/STONE: 1710 MW of Black coal in QLD1) |
1,313.7 |
709.6 |
439.1 |
527,883.5 |
54.0 |
SCADAVALUE:DISPATCH (KOGANCK: 781 MW of Black coal in QLD1) |
773.9 |
520.7 |
0.0 |
387,372.6 |
67.3 |
SCADAVALUE:DISPATCH (MILLMERN: 900 MW of Black coal in QLD1) |
826.9 |
514.2 |
205.7 |
382,543.0 |
62.2 |
SCADAVALUE:DISPATCH (STANWELL: 1540 MW of Black coal in QLD1) |
1,453.9 |
991.9 |
604.7 |
737,861.5 |
68.2 |
SCADAVALUE:DISPATCH (TARONG: 1540 MW of Black coal in QLD1) |
1,401.1 |
1,121.2 |
715.9 |
834,106.6 |
80.0 |
SCADAVALUE:DISPATCH (TARONGN: 480 MW of Black coal in QLD1) |
444.8 |
339.7 |
-1.6 |
252,715.5 |
76.4 |
Period (AEST): 2024-03-25 12:12:42 to 2024-04-25 12:12:42 |