ID | Max (MW) | Mean (MW) | Min (MW) | Sum (MWh) | Mean/Max (%) |
SCADAVALUE:DISPATCH (W/HOE#1: 312 MW of Hydro in QLD1) | 277.2 | 35.3 | 0.0 | 1,092.5 | 12.7 |
SCADAVALUE:DISPATCH (W/HOE#2: 312 MW of Hydro in QLD1) | 262.4 | 48.3 | 0.0 | 1,493.4 | 18.4 |
Period (AEST): 2023-12-03 00:00 to 2023-12-05 00:00 |
ID | Max (MW) | Mean (MW) | Min (MW) | Sum (MWh) | Mean/Max (%) |
SCADAVALUE:DISPATCH (WIVENHOE: 624 MW of Hydro in QLD1) | 491.0 | 83.9 | 0.0 | 2,586.0 | 17.1 |
Period (AEST): 2023-12-03 00:00 to 2023-12-05 00:00 |
CS Energy's Wivenhoe Power Station recently tested its capability to help restart the grid if a major blackout occurred. Learn what a ?black start? is and the role of generators like Wivenhoe at: https://t.co/v792zyxcX6 pic.twitter.com/QulU4n6lFC
CS Energy (@CSEnergyQld) May 30, 2019