ID | Max (MW) | Mean (MW) | Min (MW) | Sum (MWh) | Mean/Max (%) |
SCADAVALUE:DISPATCH (W/HOE#1: 312 MW of Hydro in QLD1) | 214.2 | 33.3 | 0.0 | 1,511.7 | 15.5 |
SCADAVALUE:DISPATCH (W/HOE#2: 312 MW of Hydro in QLD1) | 208.3 | 31.2 | 0.0 | 1,417.1 | 15.0 |
Period (AEST): 2025-06-21 00:00 to 2025-06-23 00:00 |
ID | Max (MW) | Mean (MW) | Min (MW) | Sum (MWh) | Mean/Max (%) |
SCADAVALUE:DISPATCH (WIVENHOE: 624 MW of Hydro in QLD1) | 415.7 | 64.3 | 0.0 | 2,915.1 | 15.5 |
Period (AEST): 2025-06-21 00:00 to 2025-06-23 00:00 |
CS Energy's Wivenhoe Power Station recently tested its capability to help restart the grid if a major blackout occurred. Learn what a ?black start? is and the role of generators like Wivenhoe at: https://t.co/v792zyxcX6 pic.twitter.com/QulU4n6lFC
CS Energy (@CSEnergyQld) May 30, 2019